| Sector | abcPower Plant | Tender Value | INR 1 Crore | Location | Uttar Pradesh - India | Ref.No | 85048079 | Closing Date | 04 - Jul - 2025 | | | Various types of work related to new electrification and re-electrification for the proposed estimated package to be implemented at various locations in the area of Vidyut Vitaran Khand Pradhanadhyapakpura, Gopedu, during the scheme year 2025-26 - Holding clamp for TPMO, fuse set, Top, T-off, dropper etc. , V-Type X-arm holding clamp, F-Bracket with clamp , Nut and bolt off. Size with washer, LT Clamp for PCC/STP, LT shackle Insulator, Stay Insulator, S/S base angle for 11 KV, S/S base angle for 33 KV, Danger Board, Distribution box with clamp of Three phase, Distribution box with clamp of single phase, I hook with clamp for PCC/STP, Dead end clamp for PCC/STP, Suspension clamp for PCC/STP, Stay clamp for PCC/STP, Top Channel for 11 KV, Top Channel for 33 KV, T-off Channel for 11 KV, T-off Channel for 33 KV, Dropper Channel for 11 KV, Dropper Channel for 33 KV, TPMO set for 11 KV with complete fitting, TPMO set for 33 KV with complete fitting, D.O. Fuse set for 11 KV with complete fitting, D.O. Fuse set for 33 KV with complete fitting, Fuse set installed in SMC Box, Tailless unit with lead as estimates requirement, X basing angle, Stone Pad, Earthing Rod, Straight through for 11 KV of different size, Straight through for 33 KV of different size, 11 KV CJ kit of different size, 33 KV CJ kit of different size, Guarding angle with clamp, Loading, Unloading and safe cartage of the following materials (S.N. 2.01 to 2.15) from Electricity Store Centre, Gonda to the work site/dump site (Within geographical area of EDC, Gonda), 25/63/100 KVA T/F, 250/400 KVA T/F, PVC Cable, PCC/STP Pole , ACSR Weasal Cond., AB Cable of different size, XLPE Cable of different size , GI wire 10 swg, Barbed wire, 33/11 kv disk insulator with Complete fitting, 33/11 KV pin insulator with Pin with Complete fitting, Stay set complete , Pilfer Cubical unit of different capacity, 11 KV VCB of different capacity, other line material, Erection of single PCC/ST Poles for 11 KV/L.T. line alongwith fitting of all accessories on pole., Erection of sectional double pole sectional PCC/STP pole alongwith fitting of all accessories. , Earthing of pole with complete fitting, Erection and Grouting of stay sets alongwith complete fittings. Cement, Sand & Brick ballast provided by the contractor at his own cost., Grouting of Poles with 148 CC ratio of cement, sand & brick ballast, backfilling of pits with mud completely.All required materials provided by the contractor at his own cost., Construction of 11/0.4 KV S/S for following capacity of T/F with mounting and fitting of T/F on plinth/double pole with proper fitting of all acessories and connecting with all circuit including earthing of T/F fitting with all accessories., 25/63/100 KVA T/F, 250/400 KVA T/F, Laying, Stringing & Sagging of ABC Cable up to proper sag of different size as per estimate/resspo norms, Laying, stringing, sagging & binding of conductors of 11 KV in 3 phase, 3 wire line with jumpering (where as required), Laying, stringing, sagging & binding of XLPE Cable of different size with complete fitting by digging of trench/drill method as per estimate/RESSPO norms., Complete jumpering with help of G.I. pipe as per RSSPO norms. G.I. Pipe and other required material shall be supplied by the contractor on his own cost. , Bore type Earthing and lowering "B" class G.I. Pipe (Gindal) of 50mm dia from ground upto water level not less than 20mtr. As per standard /Estimate/Resspo Norms. (All the required material shall be given by contractor on his own cost.), Chemical earthing of Pole/Transformer as per Estimate/Resspo Norms(all the material shall be provided by contractor on his own cost.), Construction of T/F plinth of size 2x2x1.5 mtr on a padding 0.25M deep in ground 1510 cement sand and brick ballast on the top of padding brick work Ist class brick of 0.95 mtr. Height and 0.35 mtr wall will be constructed. Rest wall should be 0.23 mtr thick. brick work in ratio 14 cement and cores sand in the hollow portion the sand should be filled from the ground level up to 15 centimeter below from the top of wall, cement, sand and brick ballasts should be filled up to 15 centimeer. Two no. of channel 100x50 in length 1500mm will be grouted. 0.35 cm RCC will be done with cores sand, cement and stone ballast in the ratio of 124. The T/F's plinth should be plastered on all sides 12mm thick in ration 16 by cement and cores sand. (All the required material shall be given the contractor on his own cost.), "Fabrication, installation and grouting of M.S. frame as well as fixing Tailless unit as per requirement (2/3/4 nos.) for Distribution Transformer LT side of capacity 160/250/400/630/1000 KVA. The size of M.S. frame is of following dimension-, MS Angle of 35X5 mm., Height 8 feet, grouting 01 feet with wire mesh fencing as per drawing/sample. Aluminium patia 04 Number-dimension 10X50X700 mm. With properly paint with Red Oxide paint and Yellow colour paint as well as required, Lug, copper L Piece, fu |
|
|
If you are a new user, then please
register, it's Free and then fill the form below.
If you are registered with us, just fill the form below, we will get back to you
shortly.
|
All fileds marked with '*' are compulsary.
|
|
|