| Sector | abcPower Plant | Tender Value | 59.13 Lakhs approx. | Location | Rajasthan - India | Ref.No | 85058886 | Closing Date | 25 - Jun - 2025 | | | Tender Invited For Facility Management Services - LumpSum Based - Residential; Providing and spraying PYRETHRUM extract with minimum 2 percent of relevant latest revision ISI and Detailed job as per BOQ item no 1 in scope of work and 1 Lumpsum quantity is equal to 250 .. , Facility Management Services - LumpSum Based - Residential; Providing and spraying chemical emulsion of Chlorpyriphos emulsifiable concentrate of 20 percent and Detailed job as per BOQ item no 2 in scope of work and 1 Lumpsum quantity is equal to 350.. , Facility Management Services - LumpSum Based - Residential; Diluting and Injecting Chloropyriphos 20 percent EC Along External walls where the apron is not, and Detailed job as per BOQ item no 3a in scope of work and 1 Lumpsum quantity is equal to 40.. , Facility Management Services - LumpSum Based - Residential; Diluting and Injecting Chloropyriphos 20 percent EC Along External walls below concrete or masonry , and Detailed job as per BOQ item no 3b in scope of work and 1 Lumpsum quantity is equal .. , Facility Management Services - LumpSum Based - Residential; Diluting and Injecting Chloropyriphos 20 percent EC Treatment of existing masonry using Chemical , and Detailed job as per BOQ item no 3c in scope of work and 1 Lumpsum quantity is equal to .. , Facility Management Services - LumpSum Based - Residential; Diluting and Injecting Chloropyriphos 20 percent EC Contact point of wood work to wall by chemical , and Detailed job as per BOQ item no 3d in scope of work and 1 Lumpsum quantity is equa.. , Facility Management Services - LumpSum Based - Residential; Diluting and Injecting Chloropyriphos 20 percent EC Treatment of masonry and wood-work surfaces , and Detailed job as per BOQ item no 3e in scope of work and 1 Lumpsum quantity is equal to .. , Facility Management Services - LumpSum Based - Residential; Safe Removal of honey bee hives of all sizes at different height including all tools tackles manpower , and Detailed job as per BOQ item no 4 in scope of work and 1 Lumpsum quantity is equal..
Quantity 8
|
|
|
If you are a new user, then please
register, it's Free and then fill the form below.
If you are registered with us, just fill the form below, we will get back to you
shortly.
|
All fileds marked with '*' are compulsary.
|
|
|