| | Sector | abcStainless Steel | Tender Value | INR 2.44 Crore approx. | | Location | Jharkhand - India | Ref.No | 92688031 | | Closing Date | 23 - Feb - 2026 | | | Round d clock oprn of DCW ofCCS in WMD (a)Round the clock operation of pumps, valves , drainage pumps, ventilation units of PH 4B,Operation of SST Scrappers,Operation and Backwashing of RSGF filter beds and its waste water pump operation, Operation of Hot water pumps, valves, drainage pumps at PH 4 ,Cooling tower fans &Valves of DCW ciruit etc., monitoring and maintaing parameters like suction chamber level, water flow <(>&<)> pressure, temperature, current, vibration etc. of units, inspection of leakages, illumination or any other abnormalities and reporting to shift in charge/ concerned agencies, hydraulic as well as electrical isolation and normalisation of units as and when required in coordination with the consumer departments i.e; CCS. (b) Emergency handling in situations like Power failure, leakages has to be attended. Also valves and pump operation and isolation/normalisation during shop shutdown are to be ensured. * Round the clock oprn of canal pump house Round the clock operation of pumps, valves, flow control valves, drainage pumps, submersible pumps, etc has to be ensured. Monitoring and maintaining parameters like suction chamber level, drain pit level, water flow & pressure, current, vibration etc. of units, inspection of leakages, , illumination or any other abnormalities and reporting to shift in charge/ concerned agencies and recording the events, equipment status and various parameters in a log book. Emergency situations like Power failure, leakages have to be attended. Valves and pump operation and isolation/normalisation during shop shutdown are to be done. Hydraulic as well as electrical isolation and normalisation of units as and when required in co-ordination with WMD . Housekeeping of the pump house, control rooms and the surrounding area etc. is to be done .Cleaning of basement of the pump houses has to be done.Regular cleaning of both the silt chambers as per Engr I/c. EA refers to one shift. * OPERATION OF PUMP HOUSE- 5 ROUND THE CLOCK OPERATION OF PUMPS, VALVES AND VENTILATION UNITS OF PUMP HOUSE-5. CHEMICAL DOSING (DOSING OF LIME AND ALUM). BACKWASHING OF SIX RAPID SAND GRAVITY FILTER BEDS. OPERATION OF CLARIFIER. HYDRAULIC ISOLATION AND NORMALIZATION OF UNITS AS AND WHEN REQUIRED. HOUSEKEEPING OF THE PUMP HOUSE. * OPERATION OF LANCE COOLING PUMP HOUSE ROUND THE CLOCK OPERATION OF PUMPS, VALVES AND VENTILATION UNITS OF LANCE COOLING PUMP HOUSE. HYDRAULIC ISOLATION AND NORMALIZATION OF UNITS AS AND WHEN REQUIRED. HOUSEKEEPING OF THE PUMP HOUSE. |
|
|
If you are a new user, then please
register, it's Free and then fill the form below.
If you are registered with us, just fill the form below, we will get back to you
shortly.
|
All fileds marked with '*' are compulsary.
|
|
|
|