Product Detail :
|
The Operational works of Chemical treatment of Cooling Water systems of Unit-1, 2 (500MW each) & Unit-3 (700MW), generation & dosing of Chlorine dioxide for Unit 1&2 and Sampling of pre-boiler/boiler and various other water samples at Ballari Thermal power Station (BTPS), Kuduthini for a period of ONE YEAR
|
| Tender Detail : |
The Operational works of Chemical treatment of Cooling Water systems of Unit-1, 2 (500MW each) & Unit-3 (700MW), generation & dosing of Chlorine dioxide for Unit 1&2 and Sampling of pre-boiler/boiler and various other water samples at Ballari Thermal power Station (BTPS), Kuduthini for a period of ONE YEAR |