|
Product Detail :
|
The project involves the transportation, manufacturing, supply, and assembly of a moving labyrinth ring for a 60MW Francis turbine runner at the Upper Sileru Power House. This includes dismantling the damaged labyrinth seal, conducting chemical tests, preparing necessary drawings, and ensuring proper machining and dynamic balancing of the runner. All work must adhere to specified quality assurance standards. Transportation, Manufacturing, Supply, Fixing/Assembling of moving Labyrinth Ring
|
| Tender Detail : |
The project involves the transportation, manufacturing, supply, and assembly of a moving labyrinth ring for a 60MW Francis turbine runner at the Upper Sileru Power House. This includes dismantling the damaged labyrinth seal, conducting chemical tests, preparing necessary drawings, and ensuring proper machining and dynamic balancing of the runner. All work must adhere to specified quality assurance standards. |