Product Detail :
|
Contract for supply & application of fire create refractory & allied works of bottom ash hopper during shut down of boiler for ahp-ii, 500 mw, unit no 6. procurement of 250 nb ci pipe & tee for ash evacuation line at ahp-ii, u 5 (500mw). supply, installation and commissioning with testing of emergency / safety communication twolone way call points for underground conveyor galleries in chp-i (4 x 210 mw) tps. providing and applying of hdis and hgdf compound along with nccc technique with eil approved at 500 mw turbine floor. supply cum work contract of engineered installation of passive fire protection system using o fire retardant cable coating compound (frcc) castable fire stop martar seal (fsms) on the cabling at ahp unit-1, 2, 3 & 4 coal wtp cable gallery at 210 mw at tps. procurement of various chemical consumables. reconditioning and re-babbitting of spares tg bearing no.-7 for unit no.-3 & 4. procurement of mop spare and generator seal ring for tg set. annual operation & maintenance contract of one continuous ambient air quality monitoring station (caaqms) at wtp-500 mw.
|